• Inga II and Inga III Hydroelectric ProjectDemocratic Republic of Congo: In operation. 1.250 MW and 1.350 MW, respectively. Pre feasibility and Feasibility Study.
• Mantaro HPP - Peru: In operation.770 MW (7 x 110 MW Pelton turbines), gross head 855 m. Feasibility study, Contract & construction design.
• Doradas HPP - Venezuela: 460 MW (2 x 230 MW Francis turbines), gross head 240 m. Feasibility study, contract design, procurement, construction supervision.
• Beles MPP - Ethiopia: Under commissioning: 460 MW (4x115 Francis turbines), gross head 335 m. EPC contract: Project management and construction supervision.
• Gilgel Gibe II HPP - Ethiopia: In operation. 420 MW (4 x 105 MW Pelton turbines), gross head 510 m, downstream of Gilgel Gibe I. EPC contract: Project management and construction supervision.
• San Roque M.P.P. - Philippines: In operation. 390 MW (3 x 130 MW Francis turbines), gross head 190 m. Feasibility study, optimization study, contract design.
• Daule Peripa HPP- Ecuador: In operation. 213 MW ( 3 x 71 MW Francis turbines), gross head 90 m. Bids evaluation, project management, construction supervision.
• Gilgel Gibe I HPP- Ethiopia: In operation. 189 MW ( 3 x 63 MW ) Francis turbines, gross head 238 m. Feasibility study, contract design, construction supervision.
• New Esna M.P.P. - Egypt: In operation. Generation: 102 MW (6 x 17 MW bulb turbines), gross head 7 m. Irrigation: 125.000 ha. of irrigated land. Contract and construction design, technical assistance during construction.
II - Pumped Storage & Pumping Plants
More than 12 pumped storage or pumping plants have been designed or revised by ELC0 for a total capacity exceeding 5.400 MW, all of which are in operation:
1 - 2 - 3 - 4 - 5 - 6 << prev. - next >> 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17